Difference between revisions of "04/20"
Alanscrase (talk | contribs) |
Alanscrase (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 76: | Line 76: | ||
== Actions == | == Actions == | ||
− | Who is taking this forward and what will they do? - Toby and Alan will | + | Who is taking this forward and what will they do? - Toby and Alan will act as project leaders |
There is a quite a lot of work to achieve the final outcome. | There is a quite a lot of work to achieve the final outcome. | ||
A few working parties should get quite a lot done. | A few working parties should get quite a lot done. | ||
− | Buy paint etc and material for partition<br> | + | <s>Buy paint etc and material for partition</s><br> |
− | Start to clear, prepare and paint the floor furthest from the door<br> | + | <s>Start to clear, prepare and paint the floor furthest from the door</s><br> |
Partition off from rest of tenants with existing shelving/cupboards<br> | Partition off from rest of tenants with existing shelving/cupboards<br> |
Latest revision as of 00:49, 25 October 2020
Contents
Title
Extending the Metal Space
Proposer
Alan, Toby, James and Barny
Date proposed
10 October 2020
Date for Decision
17 October 2020
What is being asked for
A budget for infrastructure improvements and some help preparing, painting the workshop and moving things around
Some storage and racking for tools and stock
A basic set of tooling so members do not need to borrow either Lion House or Toby's tools
Cost
Budget of £800 to £1,000
- Painting the floor - £100
- Racking and Storage - £200
- Workbench - ?
- Extra tooling - £400
- PPE and first aid - £150
Why/how this will be good to have
To expand into and make the Metal space a nicer, safer envirioment with a cleaner looking and well laid out workshop. This will make the place more inviting and better working place for all our members.
A group of us met in the space to discuss what needed to be done. A floorplan was surveyed and drawing created (see above). The final layout of equipment is work in progress
- To delinearate the workshop from existing tenants a division a partition would be needed, this will be made up from storage racking and workbenchs and dividers. We have some storage but will need some more.
- The floor will be painted (probably slate grey) starting with the bay furtherest from the door.
- The walls will be cleared of superfluous wiring and other bits and then painted
- Tool storage on the walls
The plan is to arrange the workshop into areas:
Machining area: Harrision Lathe, milling machine, Elliot drill bench Fabrication area: Air compressor and tools, cut off saw, grinder, assembly bench Welding area: Mig, Tig and arc welders, welding bench Hot metals area: Forge, anvil, casting equipment CNC machine area: Space should be allowed for the CNC plasma cutter when it is functional
Who is for it
Alan
Toby
James
Barny
Brian
Peter
Percy
Tim
== Comments ==
See Slack #decision-making and #metal-space
https://wiki.norwichhackspace.org/index.php?title=Metal_workshop_improvements_mk1#Any_tools_we_need
Outcome
Approved - 17 October 2020 Ben summerised.
Actions
Who is taking this forward and what will they do? - Toby and Alan will act as project leaders
There is a quite a lot of work to achieve the final outcome. A few working parties should get quite a lot done.
Buy paint etc and material for partition
Start to clear, prepare and paint the floor furthest from the door
Partition off from rest of tenants with existing shelving/cupboards
As work progresses move towards the door
Move exisitng machinery and benches into position
Buy tooling as needed
Organise first aid and Covid section
Write-up workshop induction
Write-up instructions lathe, milling machine, and other tools