Difference between revisions of "04/20"

From Norwich Hackspace
Jump to navigation Jump to search
Line 4: Line 4:
  
 
== Proposer ==
 
== Proposer ==
 
+
Alan, Toby, James and Barny
  
 
== Date proposed ==
 
== Date proposed ==
 
+
5 October 2020
  
 
== Date for Decision ==
 
== Date for Decision ==
Usually one week after posting
+
12 October 2020
  
 
== Cost ==
 
== Cost ==
Line 16: Line 16:
  
 
== What is being asked for ==
 
== What is being asked for ==
 +
* Painting the floor  - £100
 +
* Racking and Storage - £200
 +
* Workbench          - ?
 +
* Extra tooling      - £200
 +
* PPE                - £50
  
 
== Why/how this will be good to have ==
 
== Why/how this will be good to have ==
 +
To expand into and make the Metal space a nicer and safer envirioment a cleaner looking and well laid out workshop. This will make the place a better working place for all.
 +
 +
A group of us met in the space to discuss what needed to be done. A floorplan was surveyed and drawing created. The final layout of equipment is work in progress
 +
 +
* To delinearate the workshop from existing tenants a division a partition would be needed, this will be made up from storage racking and workbenchs and dividers. We have some storage but will need some more. 
 +
 +
* The floor will be painted (probably slate grey) starting with the bay furtherest from the door.
 +
 +
* The walls will be cleared of superfulious wiring and other bits and then painted
  
 +
*
  
 
== Who is for it ==
 
== Who is for it ==

Revision as of 12:48, 4 October 2020

Title

Extending into the Metal Space

Proposer

Alan, Toby, James and Barny

Date proposed

5 October 2020

Date for Decision

12 October 2020

Cost

What is being asked for

  • Painting the floor - £100
  • Racking and Storage - £200
  • Workbench - ?
  • Extra tooling - £200
  • PPE - £50

Why/how this will be good to have

To expand into and make the Metal space a nicer and safer envirioment a cleaner looking and well laid out workshop. This will make the place a better working place for all.

A group of us met in the space to discuss what needed to be done. A floorplan was surveyed and drawing created. The final layout of equipment is work in progress

  • To delinearate the workshop from existing tenants a division a partition would be needed, this will be made up from storage racking and workbenchs and dividers. We have some storage but will need some more.
  • The floor will be painted (probably slate grey) starting with the bay furtherest from the door.
  • The walls will be cleared of superfulious wiring and other bits and then painted

Who is for it

Who is against it and why

Outcome

Agreed - Completed Agreed - waiting action Rejected - More information required On hold

Actions

Who is taking this forward and what will they do?