Extending the Metal Space
Proposer
Alan, Toby, James and Barny
Date proposed
7 October 2020
Date for Decision
14 October 2020
What is being asked for
A budget for infrastructure improvements and some help preparing, painting the workshop and moving things around
Some storage and racking for tools and stock
A basic set of tooling so members do not need to borrow either Lion House or Toby's tools
Cost
Budget of £800 to £1,000
- Painting the floor - £100
- Racking and Storage - £200
- Workbench - ?
- Extra tooling - £400
- PPE and first aid - £150
Why/how this will be good to have
To expand into and make the Metal space a nicer, safer envirioment with a cleaner looking and well laid out workshop. This will make the place more inviting and better working place for all our members.
A group of us met in the space to discuss what needed to be done. A floorplan was surveyed and drawing created (see above). The final layout of equipment is work in progress
- To delinearate the workshop from existing tenants a division a partition would be needed, this will be made up from storage racking and workbenchs and dividers. We have some storage but will need some more.
- The floor will be painted (probably slate grey) starting with the bay furtherest from the door.
- The walls will be cleared of superfulious wiring and other bits and then painted
- Tool storage on the walls
The plan is to arrange the workshop into areas:
Machining area: Harrision Lathe, milling machine, Elliot drill bench Fabrication area: Air comprerssor and tools, cut off saw, grinder, assembly bench Welding area: Mig, Tig and arc welders, welding bench Hot metals area: Forge, anvil, casting equipment CNC machine area: Space should be allowed for the CNC plasma cutter when it is functional
Who is for it
Alan
Toby
James
Barney
Comments
Outcome
Awaiting decision
Actions
Who is taking this forward and what will they do?
There is a quite a lot of work to achieve the final outcome. A few working parties should get quite a lot done.
Buy paint etc and material for partition
Start to clear, prepare and paint the floor furthest from the door
Partition off from rest of tenants with existing shelving/cupboards
As work progresses move towards the door
Move exisitng machinery and benches into position
Buy tooling as needed
Organise first aid and Covid section
Write-up workshop induction
Write-up instructions lathe, milling machine, and other tools