Difference between revisions of "Use this proposal form for future decisions"
Jump to navigation
Jump to search
Ellis Waller (talk | contribs) |
Ellis Waller (talk | contribs) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 12: | Line 12: | ||
To purchase a new furnace for the space as per discussion on metal space page. | To purchase a new furnace for the space as per discussion on metal space page. | ||
| − | + | Alot of people are asking about this including new members and having the equipment for casting projects would be very useful as the one we have is a unit which is not only terrible in regards to fuel consumption, it also required pouring hot metal from a height due to its design (unit is one piece, crucible cannot be remover and the whole unit needs to be tipped to use.) | |
| − | + | Myself of course, And others have shown interest on slack. | |
| − | + | NFC | |
| − | + | To provide the metal space with a new furnace. | |
go to [[Proposals_and_decision_making_-_open |proposals]]<br> | go to [[Proposals_and_decision_making_-_open |proposals]]<br> | ||
Latest revision as of 20:20, 16 July 2026
furnace for metal space.
Ellis Waller
16.07.2026
Date for Decision
TBA
£90 including fittings, if the cost is over this I will pay myself
To purchase a new furnace for the space as per discussion on metal space page.
Alot of people are asking about this including new members and having the equipment for casting projects would be very useful as the one we have is a unit which is not only terrible in regards to fuel consumption, it also required pouring hot metal from a height due to its design (unit is one piece, crucible cannot be remover and the whole unit needs to be tipped to use.)
Myself of course, And others have shown interest on slack.
NFC
To provide the metal space with a new furnace.
go to proposals